Building Pad Construction for Shops, Barns & Storage Buildings
Professional site preparation and grading for structures of all sizes in Miami & Franklin Counties. We build level, stable pads with proper drainage.
Stable Building Pads for Your Property
Whether you’re adding a shop, barn, or storage building to your property, we prepare the site with proper grading and drainage.
Shop & Workshop Pads
Level, stable pads for workshops and shops with drainage planning to prevent water issues.
Barn & Livestock Building Pads
Site preparation for barns and livestock structures with proper base and grading.
Storage Building & Shed Pads
Grading and pad construction for storage buildings, equipment sheds, and outbuildings.
Garage & Carport Pads
Prepare building sites for detached garages and carport structures.
Your Building Needs Ground That Won’t Move
Poor pad preparation causes settling, drainage problems, and structural issues. We grade your site properly and build a stable base for your building.
Proper grading for drainage
Pads are graded to direct water away and prevent pooling around your structure
Soil assessment before we start
We evaluate soil conditions to determine the right base preparation
Level, compacted base
Your pad is built level and compacted to support your building long-term
Size flexibility
From small shed pads to large shop buildings – we handle all sizes
How We Build Pads for Kansas Terrain
Site Evaluation
We assess your property’s slope, drainage, and soil before building your pad.
Drainage Planning
Pads are graded to move water away from your building and prevent future problems.
Proper Base Prep
Level, compacted base construction that supports your structure and resists settling.
Any Building Size
From small storage sheds to large shop buildings – we build pads for all structure types.
Common Questions About Building Pads
How thick should a building pad be?
Pad depth depends on building size, soil conditions, and intended use. Most pads range from 4-8 inches of compacted base material. We recommend the right depth after assessing your property.
Do I need a building pad or a full foundation?
Building pads work for shops, barns, sheds, and storage buildings that don’t require basement or full foundation excavation. We can evaluate your project and recommend the right approach.
How long does building pad construction take?
Most building pads take 1-2 days depending on size, site conditions, and base preparation needed. We provide a timeline after site assessment.
Will my building pad settle over time?
Proper base preparation and compaction prevent most settling issues. We evaluate soil conditions and build pads that stay level and stable.
Can you build pads on sloped properties?
Yes. We grade sloped sites to create level building pads with proper drainage. Steeper slopes may require additional base work, which we’ll discuss during the estimate.
